Phase 45: Power Management, ELICS & Generator Synchronization

This phase contains 3 sections and 24 checklist topics. Use the interactive phase page to track your own learning progress.

45.1 Power management system (PMS)

  • What is a PMS and why plants use it?
  • Generator, incomer, busbar, bus coupler and outgoing feeder
  • PMS components: meters/IEDs, controller, SCADA and breakers
  • Normal electrical load versus critical load
  • PMS alarm and event monitoring
  • Electrical load prioritization and available capacity
  • Basic kW, kVAR, PF, frequency and voltage monitoring

45.2 Electrical load/control systems (ELICS)

  • What ELICS means in this specific JD and why names vary by employer
  • Load permissives and operating interlocks
  • Load-shedding conditions and priorities
  • Fast/slow load shedding awareness
  • Automatic restoration and operator approval concepts
  • Fault simulation: generator lost, frequency drops, load disconnected
  • Interface among PMS, PLC, IEDs and SCADA

45.3 Generator synchronization and power distribution

  • Why generators must be synchronized before paralleling
  • Voltage magnitude matching
  • Frequency matching
  • Phase sequence and phase angle
  • Synchronization permissives
  • Synchronizing check relay (ANSI 25) awareness
  • Circuit breaker closing interlock concept
  • Generator real/reactive load sharing awareness
  • And 2 more checklist topics